Building a Deck in Time For Summer

During the later stages of 2010 we had a job of building a 45m2 deck. This involved digging out a bank, digging 900mm deep holes for the piles, fitting the 200×50 bearers and 150×50 joists – then running out all the decking timber. The deck drawings were prepared by Jim Wilson and the bifold doors fitted by CREE8 Construction.

All timber had to be carried up from the front of the section.The final stage was building the fence around the southern edges of the deck.

The deck has been well used since completion and in December hosted a wedding reception. More often than not it is the meeting place for the balloonists after flying at the weekends.